In July I wrote that our ADC modeling had turned up something I didn’t expect: on the single most consequential process decision — stainless steel with clean-in-place versus single-use — cost and sustainability point in opposite directions. I left that unresolved and said I’d work through it at The Bioprocessing Summit. I did, on 10 August, in the CMC for ADC & Next-Generation Conjugates symposium in Boston.
What the model actually shows is a story with two strands, and they have to be read together. One strand is what you buy — the antibody and the toxin-linker. The other is what you do to it — the conversion platform that turns those materials into drug substance. Over the last five years the two have moved in opposite directions, and almost everything a leadership team needs to decide about ADC manufacturing sits in the gap between them.
The case is a dedicated conjugation facility making a cysteine-linked, HER2-targeting trastuzumab ADC. For Boston I ran it at 300 kg/year — a commercial-scale facility, rather than the 100–200 kg/year points in the July post. Scale matters to several of these numbers, and I’ll flag it where it does.
The first pass looked like nothing had happened
Start where the comparison naturally starts. Update the 2021 flowsheet to 2026 technology, hold the 2021 prices in place — antibody at $300/g, toxin-linker at $4,000/g — and run both.
2021: $599/g. 2026: $588/g.
Two percent. Six years of technology change, and if you had looked only at the total you would have concluded that nothing happened. You would have been wrong about almost everything underneath it. That is the failure mode of a late-stage spreadsheet: one number that hides the process, and hides the fact that two large movements are quietly canceling.
Two strands, opposite directions. Raw-material prices take $335/g out; the conversion platform puts $21/g back.
Strand one: the raw materials got dramatically cheaper
This is where the money moved, and it moved for reasons that have nothing to do with the conjugation process.
The antibody. Trastuzumab is no longer a $300/g proposition. Biosimilar competition has eroded the backbone, and the intensification of upstream mAb manufacturing over the same period has taken cost out on the supply side. Antibody price is really an axis rather than a number — it depends on whether you outsource or make it yourself, at what scale, and how far biosimilar erosion has reached your particular supply — so the model sweeps it and lets you drop your own point on it. For the 2026 base case I used $100/g.
The toxin-linker. This one is less visible from outside and arguably more consequential. Auristatin drug-linkers are industrializing: more suppliers, larger campaigns, and a real commercial market rather than a handful of specialist batches. There is no published campaign-scale price, so we fitted a should-cost curve to public GMP small-pack pricing. That puts campaign-scale material near $1,650/g against the $4,000/g we used in 2021 — with a band of roughly ±25 percent, which I want to be straight about. It is a modeled estimate, not a quote, and firming it up is one of the more valuable things a program can do.
Together the two take $335/g out of the cost of goods. Cost of goods for the 2026 base case lands at approximately $285/g, against $588/g on 2021 pricing.
There is a quieter gain in this strand too: the newer process uses about 6 percent less antibody per gram of ADC. At $300/g that is worth having; at $100/g it barely registers — a useful illustration of why these things have to be modeled rather than assumed. The value of a yield improvement depends on a price that is moving underneath it.
Strand two: the conversion platform got more expensive
Now set both purchased materials to zero and look at the conversion technology on its own. The 2021 process converts at about $102/g. The 2026 single-use process converts at about $123/g.
That +$21/g — the 20 percent penalty I flagged in July — is not a diffuse inefficiency. It is a substitution, legible line by line. As a share of conversion cost, capital charge falls from 20 percent to 8, and labor from 33 to 21, while consumables rise from 14 to 58. Eliminating CIP and SIP gives back the capital, the materials, and the labor; single-use assemblies at a reuse of one take it away.
Put plainly: single-use did not make conversion cheaper. It converted fixed cost into variable cost. You buy less plant and fewer people, and you buy plastic instead. For anyone with capital allocation in their remit that is the more interesting statement, because it changes what the decision is about — flexibility, utilization, multi-product facilities, and how much of your risk you want sitting in an asset base versus in a purchase order. You cannot have that conversation from a single dollars-per-gram number.
Put the strands together and the target moves
Here is what the two strands do when you read them at once.
The platform barely moved in absolute terms. Its share of cost of goods went from roughly 17 percent to 43 percent — because the materials around it got cheaper.
In 2021, at nearly $600/g, the conjugation process was noise; anyone optimizing it was working on the wrong problem. At $285/g, with $123 of it sitting in the platform, it is a first-order target. Nothing about the process changed to make that true — the rest of the bill fell away and left it exposed.
That shift is the most strategically important thing in the analysis. The effort a company should be putting into ADC conversion economics today is materially different from five years ago, and no amount of benchmarking would have told you when that changed.
The sustainability strand runs the other way
Everything above is dollars. Run the same flowsheet and the same assumptions through to mass, energy, and carbon and the pivotal decision reverses sign.
One decision, opposite signs. Modeled at 300 kg/yr and reuse = 1.
The mechanism is precise. The item that makes single-use expensive — disposable plastic — is nearly weightless. The item that makes stainless heavy — cleaning water for CIP — is nearly free. Cost accounting and mass accounting rank the same decision in opposite orders, which is exactly why both have to be computed from one set of inputs rather than assembled in two separate exercises that quietly drift apart.
Carbon carries a nuance worth stating: Scope 3 improves less than Scope 2, because single-use plastics move some carbon out of your operations and into your supply chain. The benefit is real in both, but its size depends on where you draw the boundary.
The levers: where modeling earns its keep
If the platform is now worth attacking, the question is what to attack first. Because the model is built bottom-up from unit operations, that $123/g decomposes twice — by unit operation and by cost category — and crossing the two produces a ranked list with dollar amounts attached.
From “everything looks important” to a queue, in order, with sizes on it — and then a price on the top item.
We priced the top item. Holding raw materials at zero and scale at 300 kg/year, and varying only how many times a TFF membrane is used, conversion cost runs $123/g at one use, $113 at two, $108 at five, $106 at ten. Reuse alone recovers around $17 of the ~$21/g premium, bringing the platform back to near-parity with 2021 stainless.
Note what did that. Not a new technology, not a new supplier. An assumption — how many times a membrane is used is a policy set at the design stage, and the model prices it before anyone has bought anything. Behind it sit personnel per step at $7.50/g, flow-path consumables at $5.37/g, and a queue of smaller items that are worth the effort in the order the model ranks them.
This is also the answer to the crossover I promised in July. On conversion technology alone the two processes cross near an antibody price of $236/g: above it the newer process wins on its better antibody utilization; below it the older, lower-consumables configuration is cheaper. At a biosimilar-eroded $100/g you sit on the wrong side of that line — until you change the reuse assumption. Reuse is what moves the crossover.
So the conclusion is not that single-use is a trade-off you have to accept. It is that the premium is addressable, and closing it lets you keep the sustainability and the flexibility rather than paying a permanent margin for them. Our mass and carbon runs are all at reuse = 1, so I won’t claim a modeled result we haven’t produced — but consumables are only around 260 of some 4,400 kg/kg of PMI in the 2026 case, so raising reuse cannot move that picture much.
What transfers, and what doesn’t
I want to be careful about what this analysis is. ADC manufacturing is a genuinely complex area, and this is a generic molecule and a generic process. These conclusions give you direction, not absolute values. Your numbers can only come from your own product and your own process — a specific antibody supply position, a specific payload contract, a specific facility and reuse policy.
What is grounded is the construction: built bottom-up from unit operations, every change sourced, with outputs landing inside the published benchmark ranges for cost of goods and PMI, and across about 85 percent of the published Scope 2 carbon range. The direction and the rank order are what transfer.
And the direction is clear enough to act on. Raw-material economics will keep improving as biosimilar supply and payload industrialization mature, which steadily raises the share of your cost sitting in the process. The conversion platform is where the remaining decisions live — and the levers on it are design-stage assumptions, not procurement outcomes.
Which is the argument for modeling. Roughly 80 percent of a biologic’s cost and environmental footprint is locked in by the process-design stage; by Phase I/II the decisions are effectively made. Coffman and colleagues made the same point in mAbs in 2020: platform and intensification choices taken early dominate the downstream cost structure. Finance and sustainability get reliable numbers long after that, when nothing can be changed cheaply. None of the findings above came out of a benchmark — each came out of a model, with a number next to it, early enough to still change something. The expensive decisions in an ADC facility are made before the facility exists; integrated modeling is how you make them on purpose rather than by accident.
Come and see your own numbers